Pierce Hall Renovation


Pierce Hall

Vision

Pierce Hall is being renovated to improve the quality of instructional and research environments, address space deficiencies, and help position the campus to achieve its strategic goals. The building systems in Pierce Hall are no longer adequate to support the contemporary teaching and research needs of the building’s occupants. Improvements to these building systems and selective interior renovations will extend the useful life of the existing facility to support wet laboratory based instructional programs and low to medium-intensity research laboratories. Additional instructional student laboratory stations and a new general assignment seminar room will be provided via renovation that will directly support science, technology, engineering, and mathematics (STEM) programs.

 

The projects will renovate the North Wing and the first floor of the Center Wing to create new instructional laboratories and improve research laboratories in a core campus location. Former research laboratories will be converted into instructional laboratories on the first and second floors of the north wing, and existing research laboratories located on the third floor will be modernized. Four antiquated instructional laboratories in the Center Wing will also be renovated and other spaces converted to instructional laboratory support space. A new general assignment seminar room will be created in the South Wing.

 

The construction is funded by two separate projects, one state-funded and one campus-funded, however they are being constructed concurrently.

Start Dates

Phase 1: July 2018
Phase 2: July 2019

Projected End Dates

Phase 1: March 2019
Phase 2: September 2020

Stakeholder

College of Natural & Agriculture Science, Bourns College of Engineering, Registrar

Key Milestones

Phase 1 complete in 12 months March 2019 (North wing needs to be vacated-South wing remains occupied with temp utilities)

Phase 2 complete in 18 months January 2022 (First floor instruction moves to completed north wing and is vacated-upper floors remain occupied and provided with temp utilities)

Key Contacts

CAS Planner: Jon Harvey
A&E Project Manager: Blythe Wilson

CNAS: Deborah McWilliams
Space Management: Sharyl Murdock and Jocelyne Nguema

Move Liaisons

Department

Contact Name

Advising

Barbra Wallace

Mathematics

Melissa Gomez

Physics and Astronomy

Mayela Castillo

Biochemistry

Cheryl Gerry

Environmental Sciences

Janice Border

Earth Sciences

JaniceBorder

Chemistry

Jeff Obrecht

Dean's Office

Jennifer Farias

Dean's Office

Rhonda Inzunza

Funding

Phase 1: $34,680,000 - General Fund Financing (AB94)
Phase 2: $21,475,000 - Century Bods (External Financing)
  Total  : $56,155,000

Process

 

1. Pre-Planning 2a. Preliminary Plan Schematics 2b. Preliminary Plan Design Development 3. Working Drawings 4. Construction 5. Equipment Final Fit / Installation

More Information 

General Campus Information

University of California, Riverside
900 University Ave.
Riverside, CA 92521
Tel: (951) 827-1012

Contact Information

Capital Asset Strategies
1223 University Ave Suite 240

Tel: (951) 827-2433
Fax: (951) 827-2402
E-mail: leslie.rose@ucr.edu

Related Links

Footer